Reviews
No review yet. Used engineering? Be the first to help others choose.What it does
engineering is an MCP server, a connector that lets an AI assistant use it as a tool. It is hosted: an assistant connects to it over the internet, nothing to install.
No capability identified yet from its description.
Facts come from the Official MCP Registry, as declared by the publisher. Capabilities are matched automatically (low confidence). None of this is a test of the tool.
At a glance
How to connect
As declared in the Official MCP Registry · hosted endpoint tested by Electra Index 8h ago (live check)Hosted endpoint
https://api.novtriq.tech/mcpstreamable-http
In Claude Code: claude mcp add --transport http engineering https://api.novtriq.tech/mcp
MCP settings (Claude Desktop, Cursor and other MCP clients)
{
"mcpServers": {
"engineering": {
"url": "https://api.novtriq.tech/mcp"
}
}
}Live check
Electra Index connected to the hosted endpoint 8h agoONLINE engineering answered an MCP connection on 17 Nov 2026 and introduced itself as novtriq-engineering 3.0.0 (MCP protocol 2025-06-18).
27 tools offered to AI assistants
calculate_pue· Calculate Power Usage Effectiveness (PUE) for a data centre or server room. Returns PUE score, efficiency rating, annual cost estimate, and engineering recommendations.check_nis2_readiness· Assess NIS2 Directive (EU 2022/2555) compliance readiness. Returns compliance score (0-18), maturity level, estimated fine exposure, and prioritised remediation actions.assess_epbd_score· Assess EU EPBD (2024) compliance. Returns compliance score, renovation cost estimate, deadline pressure, and priority retrofit measures.estimate_cooling_load· Estimate cooling load using CIBSE Guide B2 / ASHRAE methodology. Returns required capacity, installed capacity with redundancy, system recommendation, and annual energy.check_uae_bim_compliance· Check UAE BIM mandate applicability (Dubai Circular 196, Abu Dhabi DMT, Sharjah). Returns mandate status, compliance score, required LOD, and submission checklist.check_uae_cybersecurity· Assess UAE cybersecurity regulatory compliance (NESA IAS, Dubai ISR, CBUAE, TDRA). Returns applicable framework, compliance score, critical gaps, and mandatory controls.check_grid_feasibility_uae· Assess UAE grid connection feasibility (DEWA/ADDC/SEWA/FEWA). Returns feasibility score, connection timeline, recommended voltage, substation requirement, and next steps.get_technical_dd_quote· Generate an indicative Technical Due Diligence (TDD) fee estimate. Returns preliminary and full DD fee ranges (GBP), turnaround days, and contact CTA.calculate_carbon· Calculate operational + embodied carbon and net-zero gap (CIBSE TM65 / RICS WLCA). Returns carbon intensity, benchmark, and prioritised reduction measures with payback.thermal_load· Thermal Load Estimator for data centres / critical facilities. Returns total heat load, cooling capacity, units, airflow, chiller size, PUE estimate, power density, and a CRAC/CRAH/DLC/immersion comparison.roi_calculator· Engineering ROI calculator. Returns current manual cost, annual saving, net benefit, ROI %, payback months, 3-year NPV and a verdict.building_carbon_footprint· Building carbon footprint (Scope 1/2/3) with CRREM stranding check and embodied carbon. Returns per-scope tCO2e, intensity, CRREM compliance, net-zero gap and priority actions.
Show 15 more
building_readiness· Building Readiness assessment for change-of-use / conversion. Returns a 0-100 readiness score, project complexity, four domain scores (structural, MEP, compliance, digital/BIM) with RAG, and recommendations.eurocode_beam_designer· Preliminary Eurocode beam design (steel EC3 / composite / reinforced concrete EC2). Selects a section, computes ULS bending & shear utilisation, SLS deflection, and fire protection. Indicative, not a stamped design.eurocode_column_checker· Eurocode axial column buckling check (steel EC3 6.3.1 flexural buckling / RC EC2 5.8 simplified). Returns Ncr, non-dimensional slenderness, reduction factor chi, NRd and utilisation. Indicative, not a stamped design.eu_cost_benchmarking· Parametric construction cost benchmark across UK/EU/GCC by country, project type, specification, procurement, programme and BIM. Returns per-m2 and total cost ranges plus a cost breakdown. Indicative parametric estimate, validate against cudgnb_bim_readiness· DGNB certification pre-score and BIM (ISO 19650) maturity self-assessment from a 20-question checklist. Returns pre-score, achievable certification level, BIM level, domain breakdown and prioritised gaps. Not a formal DGNB audit.contractor_vetting· NIS2 / EPBD contractor vetting score from a 12-question checklist across financial, technical, cyber (NIS2) and energy (EPBD) categories. Flags blocking (critical) failures and returns recommended additional checks. Not a formal due-diligendigital_renovation_passport· EPBD-style staged digital renovation passport: 3-phase roadmap (quick wins, system upgrades, deep renovation) with cost ranges, energy savings and EPC trajectory from current EPC, floor area and heating type. Indicative.uk_planning_checker· UK permitted-development (GPDO 2015, England) rules engine for extensions, loft conversions and change of use. Returns a verdict (likely_pd / requires_permission / complex), applicable PD class, conditions and flags (listed building, Articlpart_s_ev· UK Approved Document S 2021 electric-vehicle charge-point requirement calculator for new build and major renovation, residential and non-residential. Returns required charge points, cable routes (1-in-5 for non-residential), minimum power apart_o_overheating· UK Approved Document O 2021 simplified-method overheating check for new residential: tests maximum glazing area (by orientation, risk zone, cross vs single aspect) and minimum free ventilation area. Returns pass/fail and points to CIBSE TM5mees_checker· England & Wales Minimum Energy Efficiency Standard (MEES) check for private rented property. Tests against the in-force EPC E minimum (domestic and non-domestic) and surfaces the PROPOSED (not yet law) EPC C / 2030 uplift as an advisory onlheatpump_heatloss· Domestic whole-dwelling fabric + ventilation heat-loss estimate for heat pump sizing (BS EN 12831 / MCS), from floor area, storeys, age band, location and glazing. Returns design heat loss (kW), recommended heat pump output, indicative SCOPeed_datacentre_pack· EU Energy Efficiency Directive data-centre reporting pack (Dir (EU) 2023/1791 Art.12 + Del. Reg (EU) 2024/1364). Determines reporting scope (IT power >= 500 kW) and computes the mandated KPIs PUE, WUE, ERF and REF. Note: the regulation manduae_climate_ghg· UAE Scope 1 + Scope 2 GHG estimate from electricity and gas use, with emirate-specific grid emission factors (Dubai/Abu Dhabi/national) and the Federal Decree-Law No. 11 of 2024 mandatory-reporting context. Grid factors carry base-year/confsap_sbem_precheck· UK SAP 10.3 / SBEM EPC precheck. Maps a known SAP rating (1-100) to its EPC band, and/or computes annual CO2 and primary energy from fuel consumption using validated SAP 10 fuel factors. The official EPC band is cost-based and needs a full
What "online" means: the server answered an MCP connection at the time of the check. It is not a guarantee of security, quality or continuous uptime. How we test: we open an MCP session and ask for the tool list, as an AI assistant would. We never run a tool and never send a key. Checked every few days. Method
Is this your server? Monitoring Pro: a check every 30 minutes and an email within the hour when it stops answering. Launch offer: $39.99 once, for life.
Facts & evidence
Each fact shows where it was seen and when.| Fact | Value | Evidence | Source | Last confirmed |
|---|---|---|---|---|
| Hosted endpoint | https://api.novtriq.tech/mcp | DECLARED | SRC-001 Official MCP Registry | 1d ago |
| Local install (package) | no | DECLARED | SRC-001 Official MCP Registry | 1d ago |
| Remote access (hosted) | yes | DECLARED | SRC-001 Official MCP Registry | 1d ago |
| Website | https://novtriq.tech | DECLARED | SRC-001 Official MCP Registry | 1d ago |
| Registry status | active | DECLARED | SRC-001 Official MCP Registry | 1d ago |
| Version | 1.0.0 | DECLARED | SRC-001 Official MCP Registry | 1d ago |
| MCP server | yes | DECLARED | SRC-001 Official MCP Registry | 1d ago |
Change history
Is this page accurate?
Flag it and our robot re-checks the official source. Reports never change a score.Is engineering still online?
Free alerts · no account▲ 0Do you run engineering? Know when it stops answering
For publishers · optionalIts hosted endpoint can be monitored. Monitoring Pro connects every 30 minutes like an AI assistant, emails you within the hour when it stops answering, keeps a 90-day availability history and adds your answer rate to your badge.
Monitoring never changes a score or a rank.
Questions about engineering
How do I connect engineering?
Use the hosted endpoint https://api.novtriq.tech/mcp in your assistant's MCP settings. The exact settings are in "How to connect" above, as declared in the Official MCP Registry.
What tools does engineering offer?
When Electra Index connected on 17 Nov 2026, it listed 27 tools: calculate_pue, check_nis2_readiness, assess_epbd_score, estimate_cooling_load, check_uae_bim_compliance, check_uae_cybersecurity, check_grid_feasibility_uae, get_technical_dd_quote and more. The full list is in "Live check" above.
Is engineering online?
Yes. Its hosted endpoint answered an MCP connection from Electra Index 8h ago.