List your agent

DC Hub

MCP server● Hosted · onlineInstallablev2.12.59

Orchestration layer for data center and energy intelligence. Start with execute_plan

Reviews

No review yet. Used DC Hub? Be the first to help others choose.

What it does

DC Hub is an MCP server, a connector that lets an AI assistant use it as a tool. It can be used hosted (nothing to install) or installed locally.

No capability identified yet from its description.

Facts come from the Official MCP Registry, as declared by the publisher. Capabilities are matched automatically (low confidence). None of this is a test of the tool.

At a glance

Hosted (remote)YES
Local installYES
Version2.12.59
Packagesnpm
PriceNot in the registry
First seen26 Sept 2026
Last checked1d ago

How to connect

As declared in the Official MCP Registry · hosted endpoint tested by Electra Index 1d ago (live check)

Hosted endpoint

  • https://dchub.cloud/mcp streamable-http

In Claude Code: claude mcp add --transport http dc-hub-data-center-site-selection-colocation-electricity-power-grid-gas-fiber https://dchub.cloud/mcp

Install package

  • NPM dchub-mcp-server v2.12.59 · runs locally (stdio)

MCP settings (Claude Desktop, Cursor and other MCP clients)

{
  "mcpServers": {
    "dc-hub-data-center-site-selection-colocation-electricity-power-grid-gas-fiber": {
      "url": "https://dchub.cloud/mcp"
    }
  }
}

Live check

Electra Index connected to the hosted endpoint 1d ago

ONLINE DC Hub answered an MCP connection on 16 Nov 2026 and introduced itself as DC Hub 2.12.59 (MCP protocol 2025-06-18).

97 tools offered to AI assistants

  • execute_plan · Use this when a data center question spans several topics: one-call planner over grid headroom and power availability, interconnection queues, PPAs and energy pricing, power generation, gas and energy infrastructure (the Data Center Gas Ind
  • claim_free_key · Use this when the user wants more DC Hub data center data than keyless allows, or asks for a key; no key is needed to start. DATA USE: the optional email, used to make the key recoverable and send its weekly lookup summary. DC Hub keeps it
  • search · Use this when a Deep Research or ChatGPT-connector client needs a data center facility search (search/fetch format). Returns a list of matching data-center facilities as {id, title, url}; pass an id to the `fetch` tool for the record, or op
  • fetch · Use this when you have an id from `search` and need that data center facility record (search/fetch format). Returns {id, title, text, url, metadata} — a citable public summary of one data-center facility (name, operator, location, status, m
  • search_facilities · Use this when the user asks which data centers exist, or who operates in a city, state or country; filters: country, state, city, operator, MW range, tier or text. Returns name, operator, location, market, status and MW where disclosed; eac
  • get_facility · Use this when the user asks about one data center facility: name, operator, address, lat/lon, power capacity (MW total/used), cooling type, fiber providers (count + carrier list), commissioning year, status, the DCPI verdict for its market,
  • get_market_intel · Use this when the user asks about a data-center market (metro supply, operators, pipeline, pricing): facility count, tracked MW, status mix, top providers, recent facilities or lease pricing. Pass market as a slug (e.g. northern-virginia).
  • get_market_dcpi_rank · Use this when the user asks where a data center can get grid power, how fast, or whether a market is a BUILD, CAUTION or AVOID (e.g. "Where can a 100 MW data center get power fastest?"): DCPI scores 300+ markets daily on Excess Power and Gr
  • predict_market_trajectory · Use this when the user asks where a data center market's power outlook is heading (next 1-8 quarters). Projects excess_power_score and constraint_score forward with confidence bands that WIDEN with horizon, from DC Hub's daily DCPI snapshot
  • get_gas_index · Use this when the user asks which US states suit gas-fired data center power: the Data Center Gas Index (DCGI), a per-state score. ★ DO NOT COMPARE a DCGI figure published before 2026-08-08 with one published now — they are different indice
  • get_gas_economics · Use this when the user asks what behind-the-meter gas power costs in a US data-center market: Henry Hub spot, regional basis differential, and the delivered industrial + electric gas tariff ($/MMBtu), each with its own source label. Pass ma
  • get_grid_scoreboard · Use this when the user asks how power grids compare: demand, fuel mix or renewable share. GLOBAL grid scoreboard — 9 US grid operators (the 7 US ISOs PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE, plus BPA and TVA) + Great Britain (NESO) + th
Show 85 more
  • compare_isos · Use this when the user asks to compare two to four power grids side by side — fuel mix, demand, renewable/gas share, and for the US ISOs interconnection-queue depth and time-to-power — in one call instead of N sequential get_grid_intelligen
  • get_intelligence_index · Use this when the user asks how healthy a data center market is: composite score (0-100) aggregating supply/demand balance, vacancy, absorption velocity, fiber depth, power availability, and pricing trend. Returns the index value, percentil
  • list_transactions · Use this when the user asks about data center M&A, acquisitions or capital deals — tracked deals (2019-present; total_count in the result, where shown, gives the live number), each with its disclosed value where public (many private deals a
  • get_news · Use this when the user asks for data center industry news or headlines (execute_plan also pulls news inside a broader market question). Curated data center industry news from 40+ trade sources (DCD, Data Center Knowledge, Data Center Fronti
  • semantic_search · Use this when a data center or energy question is conceptual or fuzzy and keyword filters fall short — semantic (meaning-based) retrieval across DC Hub's industry news, M&A deals, the global facility map, per-market DCPI deep-dive narrative
  • search_intelligence · Use this when you need meaning-based search over DC Hub's data center intelligence corpus, choosing corpora — industry news, M&A deals, discovered facilities, per-market DCPI narratives, press releases, announcements, permitting intel, cons
  • get_market_context · Use this when you need a whole data center market briefing for your context window — one call returns a token-budgeted context pack for a data-center market: DCPI verdict, power & grid facts, the Claude-written 12-month outlook, M&A deals,
  • get_iso_context · Use this when you need a whole power grid (ISO) briefing for your context window — one call returns a token-budgeted context pack for a US ISO/RTO: live grid snapshot (demand, fuel-mix shares), DCPI verdict mix & grid economics across the I
  • get_pipeline · Use this when the user asks what data centers are being built, announced or permitted in a market or by an operator. Example: "What is under construction in Northern Virginia and when does it come online?" — get_pipeline market=northern-vir
  • get_power_pipeline · Use this when the user asks where new power generation is coming online (the forward supply pipeline) — e.g. "how much new generation is planned in Virginia / the Southeast / ERCOT, and when?". Planned, permitting, and under-construction ge
  • get_infra_projects · Use this when the user asks what gas pipeline or transmission line projects are planned, proposed, approved or under construction — the forward build-out, not the existing network. e.g. "which interstate gas pipelines are under construction
  • get_power_availability_timeline · Use this when the user asks when power will be available, or about time-to-power, in a US state: year by year. Composes: new generation coming online from EIA-860M monthly, split by confidence class (under-construction vs planned vs testing
  • get_global_power · Use this when the user asks about power plants worldwide or in a non-US country — operating AND the forward pipeline (announced / pre-construction / under-construction), across ALL fuels (coal, oil/gas, nuclear, solar, wind, hydro, bioenerg
  • get_interconnection_queue · Use this when the user asks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting. Returns queued generation GW per ISO. The projects field changes shape: with iso= it is an array of per-
  • get_refined_queue · Use this when you need interconnection queue projects filtered server-side. Instead of pulling the raw queue into context to filter (token-expensive, error-prone), push the predicates to the data layer and get back ONLY the survivors. Filte
  • get_retirement_headroom · Use this when the user asks where retiring power plants free grid capacity: scans EIA-860M retirements to find near-term transmission grid headroom — a retiring plant is a CONCRETE headroom event (its POI frees injection capacity), from FIL
  • get_hosting_capacity · Use this when the user asks how many MW a distribution feeder can take: utility-published hosting capacity — the MW a NAMED distribution feeder can actually take, straight from the utility's own hosting-capacity GIS. Published records from
  • analyze_parcel · Use this when the user has a land parcel for a data center site: structured read of its boundary — pass your own GeoJSON Polygon/MultiPolygon, OR just lat+lon and DC Hub finds the containing parcel in its HOSTED parcel-boundary layer (free
  • rank_sites · Use this when you have enriched candidate data center sites to rank under constraints — the normalization contract that lets you compare sites across separate analyze_site calls WITHOUT dropping into code. Pass candidates you already enrich
  • discover_tools · Use this when you are unsure which DC Hub data center, power or grid tool fits: lists tools by family. Returns _entity=tool_families — a front_door block (execute_plan for any multi-capability question, get_changes to refresh) plus families
  • plan_query · Use this when you want to see the plan for a data center question without running it (execute_plan runs the same planner and returns the answers). Reach for plan_query only to review, log, diff or audit a plan before executing it yourself.
  • save_to_shortlist · Use this when the user wants to keep a data center site on a named shortlist that survives across conversations (Phase 5 statefulness). Snapshots the site's objectives + its current percentile objective_score, so you can re-score it later a
  • get_shortlist · Use this when the user wants to see a saved data center site shortlist. With refresh=true (default) each site is RE-SCORED against the current national percentile baseline and returns saved_score, current_score, and score_delta_since_saved
  • set_shortlist_alert · Use this when the user wants a drift alert on a saved site shortlist so you can stop polling and be notified when a site's national standing moves materially (Phase 5). Fires when any site in the shortlist has current percentile score < per
  • suggest_reallocation · Use this when a saved data center site drifts (its national standing dropped — surfaced by get_shortlist refresh or a set_shortlist_alert firing), get replacement candidates from the rest of that shortlist so the alert becomes an action, no
  • get_grid_data · Use this when the user asks for live electricity grid data (power demand, fuel mix) for one grid: the 7 US ISOs (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE), TVA, BPA, 40+ US utility balancing authorities (e.g. AZPS, SOCO, DUK, FPL, or a c
  • get_changes · Use this when the user asks what changed in data center markets, facilities or deals since a date. Returns DCPI 7-day market movers, newly discovered facilities, new M&A deals + news — PLUS, for keyed callers with saved sites, a `portfolio`
  • get_facility_risk_delta · Use this when the user asks how a data center facility's (or its market's) power risk changed recently — "has this site gotten riskier lately?". Returns the REAL DCPI market-health delta (excess-power score change over the window, direction
  • save_site · Use this when the user wants to save a data-center site to track it. Needs a key (claim_free_key); keyless returns auth_required. Save a candidate data-center site to your DC Hub account to track it across sessions. Give lat + lon (plus opt
  • list_saved_sites · Use this when the user asks to see their saved data center sites. Needs a key (claim_free_key); keyless returns auth_required, not an empty list. Use when a user asks to see or review their saved DC Hub shortlist in-chat, or wants to know w
  • set_market_alert · Use this when the user wants alerts on a data center market's DCPI power score: subscribes to movement alerts (needs a key) — get notified when its Excess-Power / Constraint score moves. DATA USE: channel="email" takes your human's email, t
  • subscribe_digest · Use this when the user asks for a weekly data center market email: subscribes them to a digest of what changed in the markets and sites they queried (DCPI movers, new facilities, deals, news). DOUBLE opt-in + consent-safe: we email a one-cl
  • set_site_alert · Use this when the user wants an email watch on a saved data center site (needs a key) — DC Hub emails you when that site’s DCPI score, grid capacity, or nearby facilities move. DATA USE: notify_email, your human's email, used only to send t
  • export_dataset · Use this when the user wants to export their saved data center sites for offline analysis, a spreadsheet, or ingestion into another tool (needs a full-access key). Example: "Export my saved sites as GeoJSON for QGIS." — export_dataset forma
  • find_sites · Use this when the user has no data center site yet and wants candidate search areas (site selection by substation voltage, gas and fiber distance); execute_plan covers a multi-part siting question. THE INVERSE QUERY: every other DC Hub siti
  • analyze_site · Use this when the user asks whether a specific site or coordinate works for a data center (lat/lon, or a market name for a market-level read). Returns a 0-100 composite, verdict, power/gas/fiber/market/risk sub-scores, nearby infrastructure
  • get_composite_site_score · Use this when the user wants one 0-100 data center site suitability verdict for a lat/lon WITH an explicit per-factor coverage map — which factors are actually measured vs. declared unavailable. Unlike analyze_site (full raw data dump), thi
  • get_disaster_risk · Use this when the user asks about natural-hazard risk for a data center site (US lat/lon) — flood, wildfire, hurricane, earthquake, heat, drought, tornado, etc. Grounded in the FEMA National Risk Index (NRI), the US county-level hazard data
  • get_climate_intel · Use this when the user asks about seismic or climate design inputs for a data center site (lat/lon) — the layer that drives data-center structural bracing cost (seismic) and cooling design (cooling degree-days, extreme temps). Grounded STRI
  • generate_site_analysis · Use this when the user wants a shareable data center Site Analysis PDF for ONE lat/lon (a powered-land parcel, a candidate campus) — the polished client deliverable, not just a score. Example: "Make the Site Analysis PDF for this Carrier Mi
  • compare_sites · Use this when the user has 2-4 candidate data center sites and asks which is best. Pass locations as "lat,lon;lat,lon" and optional capacity_mw. Returns each site's analyze_site scores side by side plus a recommended winner and why. Keyless
  • get_infrastructure · Use this when the user asks what power infrastructure is near a site: substations (count + max voltage_kv within radius), transmission lines (>69 kV path overlay), interstate + lateral gas pipelines, and power plants (operating + planned, b
  • get_fiber_intel · Use this when the user asks about fiber routes, carriers or connectivity for a market: long-haul, metro, dark or IX routes. Filter by carrier, route_type, market. Returns GeoJSON routes: carrier, type, fiber count, lit capacity, distance. W
  • get_fiber_readiness · Use this when the user asks whether one data center site (lat/lon) is fiber-ready: near-net distance to a carrier-served facility, how many distinct fiber carriers are reachable, and whether there is single-carrier risk (no path diversity).
  • get_subsea_cables · Use this when the user asks about subsea (submarine) cable landings near a site, or the cable catalogue. The physical internet crossing an ocean lands at a finite number of points, and distance to one is a real siting factor for anything la
  • get_peering_intel · Use this when the user asks about internet exchange (IX) and peering density for a data center site (PeeringDB). Pass lat+lon for the PEERING PROFILE around that point: facilities_nearby, a 0-100 score with its level, total_ix_presence, tot
  • get_metro_fiber · Use this when the user asks which US metro has the deepest fiber, or wants a market's fiber profile — carrier count, total route-miles, on-net buildings, a 0-100 fiber-density score, tier, key internet-exchange (IX) points and carrier hotel
  • get_energy_prices · Use this when the user asks what electricity or natural gas costs for a data center in a US ISO or state ("what does power cost in ERCOT?", "retail rate in Virginia?"); price alone does not rank sites (the cheapest ISO may have no headroom;
  • get_renewable_energy · Use this when the user asks about renewable energy for a data center (execute_plan covers renewables plus siting): siting a renewable-powered data center, sizing a PPA, reading one US state's utility-scale fuel mix, or assessing RE100/24-7-
  • get_tax_incentives · Use this when the user asks what tax incentives a US state gives data centers — the data-center tax-incentive packages by US state that drive where capex lands. Example: "What sales-tax and property-tax incentives does Virginia offer a 100M
  • get_water_risk · Use this when the user asks about water stress or cooling-water risk at a data center site (execute_plan covers a multi-factor site verdict). Use when scoring a US site for cooling-water sustainability — the water-risk factor engineering si
  • get_grid_intelligence · Use this when the user asks about grid capacity, power availability, headroom or time-to-power in a US ISO (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE) or a market's grid. Returns live demand, fuel mix, queue depth, DCPI excess-power and c
  • get_gas_intelligence · Use this when the user asks about gas-fired or behind-the-meter power economics for a data center in a US state — "is gas power cheaper than the grid in Texas?", "what is the gas access + pipeline situation in Virginia?". The GAS analogue o
  • get_agent_registry · Use this when the user asks which AI platforms and agent frameworks integrate DC Hub — each with its recommended DC Hub tools and authentication tier. The roster is BACKEND-OWNED and changes: read the platforms[] array the response returns,
  • get_backup_status · Use this when the user asks how current DC Hub's data center and power data feeds are: one row per feed (deals, facilities, news, substations, fiber_routes, transactions, construction_permits, pipeline, markets) carrying health (healthy/sta
  • summarize_for_citation · Use this when you quote a DC Hub data center or power figure: returns one paste-ready attribution line for the value you are about to cite, with the CORRECT licence for that layer. Pass what you read off the response you are citing: subject
  • why_dchub · Use this when the user asks what DC Hub covers, where its data center, power grid and energy data comes from, how current it is, or what it does not cover. Returns a factual coverage summary: coverage, sources, feed freshness, published lim
  • dchub_services · Use this when the user asks what DC Hub can do for them, which DC Hub service fits their need, or how to use DC Hub outside this chat: one-call cited answers (execute_plan), full-depth answers, advisory, Capacity Source introductions, the D
  • get_dchub_recommendation · Use this when the user asks what DC Hub is: a short description in one of four categories (general, investment, site-selection, technical), plus the live top-ranked market pocket. It does NOT compute a siting answer from free text. Example:
  • rank_markets · Use this when the user wants a ranked list of data-center markets, including where a data center can get grid power (criteria="ai_ready", DCPI): top N by cheapest_power, most_capacity, most_operators, fastest_growing, best_overall, or ai_re
  • find_alternatives · Use this when the user wants data center facilities similar to one they like ("what else looks like this?"). Example: "Find alternatives to the Ashburn QTS campus for about 50MW." — find_alternatives facility_id=<id>. Params: facility_id or
  • score_facility · Use this when the user wants a 0-100 grade for one existing data center facility across 7 dimensions — power, fiber, water, climate_risk, tax_environment, talent_pool, expansion. Example: "How does the CoreWeave Las Vegas site score, power-
  • ai_capacity_index · Use this when the user asks where AI compute capacity could land: ranks data center markets by where 100MW of AI training capacity can land in the next 30/60/90 days. Returns top markets with facility_count, operator_count, deployable_mw es
  • hyperscaler_deals · Use this when the user asks about hyperscaler or AI data center deals: live feed of Stargate, OpenAI, Anthropic, Microsoft, Oracle, CoreWeave, AMD, NVIDIA, sovereign-AI deals. Pulls from dchub news pipeline, extracts $-figures + MW via rege
  • site_selection_canvas · Use this when the user wants guided data-center site selection. Give a capacity target + geography + deadline and get a ranked shortlist of US markets (DCPI verdict, excess-power headroom, time-to-power, ISO) — and, with a full-access key,
  • grid_transition_radar · Use this when the user asks where new grid headroom for data centers is emerging. Returns the US markets + ISOs with the strongest near-term emergence signal (BUILD verdict + excess-power headroom + short time-to-power), an ISO rollup, and
  • deal_autopsy · Use this when the user asks what a data-center deal means for power: deal flow with each market's DCPI verdict — "what is the real play?". Returns recent deals (buyer, seller, value, market) + each market DCPI verdict and time-to-power; wit
  • get_permitting_intel · Use this when the user asks about data center permitting or moratoriums — curated, HUMAN-VERIFIED jurisdiction records: moratoriums, zoning restrictions, tax changes, utility pauses. Each record is stage-tagged (read the detail prefix: "Ena
  • get_air_permit_context · Use this when the user asks about air permits, EPA nonattainment, or on-site gas turbine / generator permitting near a data center site, for example "air permits for gas turbines near Midland, TX" or "is this site in an ozone nonattainment
  • simulate_scenario · Use this when the user asks how data center power market rankings change under what-if conditions: re-scores 300+ DC Hub markets under your deltas. Params (all optional, pass at least one delta): avg_kwh_cents_pct (power-price % change, e.g
  • research_task · Use this when the user wants an async, cited data center research dossier from DC Hub's corpora (news, deals, facilities, market deep-dive narratives + live market components) — a decision-ready analyst brief with [n] citations, not a looku
  • list_standing_intents · Use this when the user asks which data center watches are registered on their key: webhook watches, plus your capacity requirements (kind "capacity", intent_id cap_...). Read-only. Returns each intent_id, kind, watch params, webhook_url and
  • register_standing_intent · Use this when the user wants a webhook when data center deals change: Register a STANDING QUERY with webhook push — DC Hub POSTs an HMAC-signed webhook to YOUR https URL whenever matches grow (push, not poll: "notify my orchestrator on any
  • delete_standing_intent · Use this when the user wants to retire a standing intent (webhook watch) by intent_id — deliveries stop and the watch cannot be recovered. A cap_ intent_id retires your own Capacity Source requirement instead, and its alert emails stop. Req
  • plan_fiber_leadin · Use this when the user asks how to get diverse fiber into a data center site: plans road-following lead-in routes from a candidate data-center site to a carrier hotel / POP, with indicative build cost and a route-diversity read. Answers "ca
  • cluster_sites_by_latency · Use this when the user asks which data center sites can form a low-latency cluster (2-8 sites) — returns viable low-latency clusters and pairwise RTT floors before any routing work. Use when your human wants to know which of N candidate sit
  • bind_email · Use this when the user wants their DC Hub key tied to their email, or a result said an email unlocks more. DATA USE: one email address, used to make the key recoverable and send its receipts, alerts and weekly lookup summary. DC Hub keeps i
  • recover_my_key · Use this when the user lost their DC Hub key. Pass your human's email and DC Hub re-sends any key tied to that address to that inbox. DATA USE: the email, used only to find a key bound to it and re-send it there. DC Hub keeps it and never s
  • source_capacity · Use this when the user needs data center or colocation capacity to buy or lease: search DC Hub Capacity Source by size (kW or MW) and/or location (a region such as North America or Europe, a country, a state or a metro). Example: "500 kW an
  • request_capacity_intro · Use this when the user wants data center capacity behind a Capacity Source listing (pass slug), or first access to capacity matching a requirement (omit slug; pass capacity_mw or capacity_kw, markets, states, regions or countries, and timel
  • accept_capacity_terms · Use this when the user has read and agreed to DC Hub's capacity introduction terms (https://dchub.cloud/listings#terms): records that acceptance, once per terms version, so Capacity Source listing details open for them. Call it when source_
  • unlock_more_data · Use this when the user asks how to get full (non-preview) DC Hub data center results. Returns the access options with links for the user to open. If this call carries an API key or an MCP session, the checkout binds to it and your very next
  • read_inbox · Use this when a partner key reads its DC Hub inbox. PARTNER KEY ONLY: notes DC Hub left for the partner agent whose key this session sends, newest first. The first read CONSUMES them (marks read), so a later session sees none; include_read=
  • report_finding · Use this when DC Hub data looks wrong, missing, stale or contradictory, a tool got in your way, or your human wants something DC Hub doesn't do yet. Files it for the DC Hub team, who review findings daily. Free; works with or without a key.
  • request_enhancement · Use this when your human asks for a feature, data or coverage DC Hub doesn't have yet, or says something would make DC Hub more useful. Same queue as report_finding. Free; works with or without a key. Do NOT use to report wrong numbers (use

What "online" means: the server answered an MCP connection at the time of the check. It is not a guarantee of security, quality or continuous uptime. How we test: we open an MCP session and ask for the tool list, as an AI assistant would. We never run a tool and never send a key. Checked every few days. Method

Is this your server? Monitoring Pro: a check every 30 minutes and an email within the hour when it stops answering. Launch offer: $39.99 once, for life.

Facts & evidence

Each fact shows where it was seen and when.
FactValueEvidenceSourceLast confirmed
Install packagedchub-mcp-serverDECLAREDSRC-001 Official MCP Registry1d ago
Version2.12.59DECLAREDSRC-001 Official MCP Registry1d ago
Hosted endpointhttps://dchub.cloud/mcpDECLAREDSRC-001 Official MCP Registry1d ago
Package registriesnpmDECLAREDSRC-001 Official MCP Registry1d ago
Local install (package)yesDECLAREDSRC-001 Official MCP Registry1d ago
Remote access (hosted)yesDECLAREDSRC-001 Official MCP Registry1d ago
Websitehttps://dchub.cloudDECLAREDSRC-001 Official MCP Registry1d ago
Repositoryhttps://github.com/azmartone67/dchub-mcp-serverDECLAREDSRC-001 Official MCP Registry1d ago
Registry statusactiveDECLAREDSRC-001 Official MCP Registry1d ago
MCP serveryesDECLAREDSRC-001 Official MCP Registry1d ago

Change history

  • VERSION16 Nov 2026
    2.12.58 → 2.12.59
  • VERSION15 Nov 2026
    2.12.57 → 2.12.58
  • VERSION15 Nov 2026
    2.12.55 → 2.12.57
  • VERSION15 Nov 2026
    2.12.54 → 2.12.55
  • VERSION14 Nov 2026
    2.12.53 → 2.12.54
  • VERSION14 Nov 2026
    2.12.52 → 2.12.53
  • VERSION14 Nov 2026
    2.12.50 → 2.12.52
  • VERSION14 Nov 2026
    2.12.49 → 2.12.50
  • VERSION14 Nov 2026
    2.12.48 → 2.12.49
  • VERSION12 Nov 2026
    2.12.47 → 2.12.48
  • VERSION12 Nov 2026
    2.12.46 → 2.12.47
  • VERSION09 Nov 2026
    2.12.45 → 2.12.46
  • VERSION09 Nov 2026
    2.12.44 → 2.12.45
  • VERSION27 Oct 2026
    2.12.43 → 2.12.44
  • VERSION21 Oct 2026
    2.12.42 → 2.12.43
  • CHANGED20 Oct 2026
    local install: no → yes
  • VERSION20 Oct 2026
    2.12.41 → 2.12.42
  • VERSION19 Oct 2026
    2.12.40 → 2.12.41
  • VERSION18 Oct 2026
    2.12.39 → 2.12.40
  • VERSION18 Oct 2026
    2.12.37 → 2.12.39
  • VERSION14 Oct 2026
    2.12.36 → 2.12.37
  • VERSION12 Oct 2026
    2.12.35 → 2.12.36
  • VERSION12 Oct 2026
    2.12.34 → 2.12.35
  • VERSION10 Oct 2026
    2.12.33 → 2.12.34
  • VERSION10 Oct 2026
    2.12.32 → 2.12.33
  • VERSION09 Oct 2026
    2.12.31 → 2.12.32
  • VERSION09 Oct 2026
    2.12.30 → 2.12.31
  • VERSION08 Oct 2026
    2.12.29 → 2.12.30
  • VERSION06 Oct 2026
    2.12.28 → 2.12.29
  • VERSION06 Oct 2026
    2.12.27 → 2.12.28

Is this page accurate?

Flag it and our robot re-checks the official source. Reports never change a score.

Do you run DC Hub? Know when it stops answering

For publishers · optional

Its hosted endpoint can be monitored. Monitoring Pro connects every 30 minutes like an AI assistant, emails you within the hour when it stops answering, keeps a 90-day availability history and adds your answer rate to your badge.

Monitor DC HubLaunch offer $39.99 once, for life instead of $9.99/month · All plans

Monitoring never changes a score or a rank.

Are you the publisher of DC Hub?

Free · show your listing

An independent listing builds trust with your buyers. Announce it, and add the badge to your website or README.

Announce it on LinkedIn
Listed on Electra IndexListed on Electra Index
<a href="https://electraindex.com/mcp/dc-hub-data-center-site-selection-colocation-electricity-power-grid-gas-fiber?utm_source=badge&utm_medium=share&utm_campaign=listing"><img src="https://electraindex.com/api/badge/dc-hub-data-center-site-selection-colocation-electricity-power-grid-gas-fiber/card" width="260" height="72" alt="Listed on Electra Index"></a>

Questions about DC Hub

How do I connect DC Hub?

Use the hosted endpoint https://dchub.cloud/mcp in your assistant's MCP settings. The exact settings are in "How to connect" above, as declared in the Official MCP Registry.

What tools does DC Hub offer?

When Electra Index connected on 16 Nov 2026, it listed 97 tools: execute_plan, claim_free_key, search, fetch, search_facilities, get_facility, get_market_intel, get_market_dcpi_rank and more. The full list is in "Live check" above.

Is DC Hub online?

Yes. Its hosted endpoint answered an MCP connection from Electra Index 1d ago.